2023
- BMI Automotive: Napa 70K Fire Water Storage Tank Project
- Tridon Corporation: US Coast Guard 4000 sf Admin. Office PEMB Project
- GGHG, LLC: Electrical Upgrades – Surge Protection Device
2024
- Mega United: DPW PEMB 9,600 sf. Covered Basketball Courts
- BME & Sons: Chalan Pago Multi Purpose Center PEMB Whse. 12,000 sf. PEMB
- BME & Sons: B400 20GA Special Meta Roofing System (GCC Culinary)
- Oyo Pacific: Grass & Vegetation Clearing – Tiyan Landfill
- US Coast Guard: Supply & Install 2 ea. Large 20’ x 28’ Roll-up Doors
- Prime Projects Int’l (PPI) Const.: TMR Roll-up Doors – 24 ea. Roll Up Doors 180 mph
- Austability Pty, LLC: Typhoon Mawar Roll Up Doors – 60 ea. @180 mph RUD’s
- GR Construction: Supply & Loading Rack Steel Loading Rack Canopy
- PFM: AFCAP Typhoon Mawar Roll Up Doors: B51108 & B61210 – 8 ea. RUD’s
- ASRC: Supply & Install 2 ea. 1,000 gal. LP Gas Propane Storage Tank
- AIMWS: Typhoon Mawar Recovery – replace Damaged Roll Up Doors – 36 ea. RUD w/ Storm Bracing Systems
- AIMWS / CDCI Reconstruct 4,800 sf. PEMB Steel Whse. Andersen AFB B20014
- CHK: Naval Station Guam – R & R B365 RUD Shutters – 7 ea.
- CHK: B364 Remove & Replace Roll-up Doors – 4 ea.
- CHK: NH5 NEX Canopy – Demolition & Reconstruction 52’ x 36’
- IP&E: Double Deck Canopy - Supply
- EA Engineering: Tiyan Landfill Fencing 2, 500 LF @ 8 ft. w/Barb wire strand
- OH Construction: MTM PEMB 10,240 sf. Covered Basketball Court Structure
2025
- CDCI Naval Station Guam Bldg. B564 PEMB Roofing & Wall Replacement
- CHK: J323 Camp Blaz – Motor Pool Automatic Car Wash Facility
- Chugach Consolidated Solutions: Guam High School TEMP Facility 18,500 sf.
- FJR Ent: Agana Shopping Center Car Wash Facility